Peak Well Systems Blog

Full workover avoided through innovative use of an LWIV to perform first subsea slickline intervention

Posted by Peak Well Systems on 01-Nov-2016 08:00:00

A National Oil Company with operations in offshore Africa experienced a Tubing Retrievable Surface Controlled Sub-Surface Safety Valve (TRSCSSSV) failure on its subsea well at 951m, with 7000bopd production locked in.

Peak 's key objective was to offer a cost effective solution which included setting a new type of valve in place of a full workover, in a challenging subsea environment.

Read More

Topics: Technical Case Studies, SIM Plugs, Offshore

Successful location and stabilisation of a leak path in the completion string

Posted by Peak Well Systems on 04-Oct-2016 08:00:00

An International Oil Producer with operations in Africa encountered wellbore leakage issues within the completion string in one of their offshore wells.

Peak provided an efficient and effective rig-less solution utilising the SIM Retrieveable Bridge Plug to isolate and stabilse the leak path whilst ensuring the intervention was carried out safely and with zero downtime.

Read More

Topics: Technical Case Studies, SIM Plugs, Offshore

Improving the performance of wells through advanced downhole technology

Subscribe to our blog for insights into the latest industry technologies and innovations, and learn how we are helping our customers reduce well operating costs and improve well performance.

Subscribe to Email Updates

Recent Posts