Efficient straddle solution enables successful repair of production X-tree

Posted by Peak Well Systems on 09-May-2017 13:49:54

At Peak, we pride ourselves on our design, engineering and innovation expertise.

Recently, a customer approached Peak to design an innovative straddle solution to anchor and seal in a production X-tree above and below a leaking Upper Master Gate Valve (UMGV) Stem Seal to allow repairs to be undertaken.

Read More

Topics: Well Barrier & Isolation, Straddle System, Innovation, bespoke solutions

Schlumberger acquires Peak Well Systems

Posted by Peak Well Systems on 17-Jan-2017 17:12:55

Following several successful project collaborations, on January 5, 2017, Schlumberger announced the acquisition of Peak Well Systems.

This is certainly an exciting chapter in our company development and one that also presents our valued customers with a number of benefits going forward.

Read More

Topics: Peak Corporate, Schlumberger, Acquisitions

Full workover avoided through innovative use of an LWIV to perform first subsea slickline intervention

Posted by Peak Well Systems on 01-Nov-2016 08:00:00

A National Oil Company with operations in offshore Africa experienced a Tubing Retrievable Surface Controlled Sub-Surface Safety Valve (TRSCSSSV) failure on its subsea well at 951m, with 7000bopd production locked in.

Peak 's key objective was to offer a cost effective solution which included setting a new type of valve in place of a full workover, in a challenging subsea environment.

Read More

Topics: Technical Case Studies, SIM Plugs, Offshore

Successful location and stabilisation of a leak path in the completion string

Posted by Peak Well Systems on 04-Oct-2016 08:00:00

An International Oil Producer with operations in Africa encountered wellbore leakage issues within the completion string in one of their offshore wells.

Peak provided an efficient and effective rig-less solution utilising the SIM Retrieveable Bridge Plug to isolate and stabilse the leak path whilst ensuring the intervention was carried out safely and with zero downtime.

Read More

Topics: Technical Case Studies, SIM Plugs, Offshore

Collection of data with minimal pressure loss in flowing wells

Posted by Peak Well Systems on 13-Sep-2016 12:30:00

If you are like Peak's Customers, you require a variety of Gauge Hangers - from simple, effective Plug Hangers that carry downhole gauges for well monitoring, to Gauge Hangers for larger tubing or more complex well geometries.

Peak offers its Customers a choice best fitting the application and well structure. We offer a range of slickline-set gauge hangers which can be used to suspend data acquisition devices for monitoring characteristics in flowing wells, or as an anchor for instruments that require suspension in the wellbore. Due to the flexibility of the SIM System, these devices can be suspended anywhere in the well.

Peak’s Gauge Hangers offer the advantage of having a robust design and build, ideal for challenging downhole environments and in high flow rate wells, which means they can be confidently placed close to perforating zones.

Peak's gauge hangers have been put to the test - our Large Bore Gauge Hanger and SIM Running Tool were used to collect valuable data with minimal pressure loss in six flowing wells for a National Oil Company in Malaysia. Read on to find out more:

Read More

Topics: Data Acquisition, Large Bore Gauge Hanger, Well Monitoring