Peak Well Systems Blog

Peak Customer commissions Peak to undertake gas testing of the 4-1/2” and 5-1/2” SIMULTRA Retrievable Bridge Plug

Posted by Peak Well Systems on 23-Aug-2016 15:00:00

Peak is pleased to announce that it has been commissioned by an international oil company (the “Customer”) to undertake gas testing of both the 4-1/2” and 5-1/2” SIMULTRA Retrievable Bridge Plug at a 10,000psi and 175degC specification. 

Read More

Topics: Testing, SIMULTRA, MetaPlex

Peak’s 5-1/2” SIMULTRA Retrievable Bridge Plug receives V0 certification

Posted by Peak Well Systems on 09-Jun-2016 13:01:21

Peak Well Systems has reached another important milestone in the development program for its SIMULTRA range of retrievable bridge plugs. The range of available plugs has now been extended into 5-1/2” applications with the successful ISO-14310 V0 gas testing of the 5-1/2” tool in 20lb API casing.

Read More

Topics: Testing, SIMULTRA, MetaPlex

Peak’s SIMULTRA Retrievable Bridge Plug receives V0 certification at 10kpsi

Posted by Peak Well Systems on 26-Apr-2016 12:00:00

Peak Well Systems has reached a major milestone in the development program for its SIMULTRA range of retrievable bridge plugs with the successful ISO-14310 V0 gas testing of the 4-1/2” tool in 15.1lb API pipe at an industry leading 10,000psi and 175degC specification.

Read More

Topics: Testing, SIMULTRA, MetaPlex

Three factors driving the development of retrievable bridge plugs

Posted by Peak Well Systems on 05-Jan-2016 07:00:00

A new era of energy production demands a new generation of downhole plugs.

Traditional solid elastomer seals have been the mainstay of the industry in a wide range of sealing applications for over 75 years.

So why, after all that development, do operators have limited confidence in retrievable bridge plug services……and why do they still worry about significant cost over-runs due to failures and unplanned operations.

It’s because of concerns about the reliability of plug retrieval.

These real concerns are rooted in the three factors that have been driving the development of retrievable plugs in recent years:

  • a trend towards higher pressures and temperatures,
  • an increasing focus on gas production and therefore on gas rated plugs, and
  • a corresponding focus on higher regulatory standards and benchmarks for plug performance

To find out more watch our new motion graphic.

Read More

Topics: Flow Control, New Product Launch, Well Barrier & Isolation, Technology, SIMULTRA

IMAGINE...redressing high spec plugs in the field

Posted by Peak Well Systems on 21-Dec-2015 10:00:00

YOU IMAGINED IT. WE CREATED IT.

Read More

Topics: Flow Control, Well Intervention, New Product Launch, Technology, SIMULTRA, MetaPlex

Improving the performance of wells through advanced downhole technology

Subscribe to our blog for insights into the latest industry technologies and innovations, and learn how we are helping our customers reduce well operating costs and improve well performance.

Subscribe to Email Updates

Recent Posts