Peak Well Systems Blog

Three factors driving the development of retrievable bridge plugs

Posted by Peak Well Systems on 05-Jan-2016 07:00:00

A new era of energy production demands a new generation of downhole plugs.

Traditional solid elastomer seals have been the mainstay of the industry in a wide range of sealing applications for over 75 years.

So why, after all that development, do operators have limited confidence in retrievable bridge plug services……and why do they still worry about significant cost over-runs due to failures and unplanned operations.

It’s because of concerns about the reliability of plug retrieval.

These real concerns are rooted in the three factors that have been driving the development of retrievable plugs in recent years:

  • a trend towards higher pressures and temperatures,
  • an increasing focus on gas production and therefore on gas rated plugs, and
  • a corresponding focus on higher regulatory standards and benchmarks for plug performance

To find out more watch our new motion graphic.

Read More

Topics: Flow Control, New Product Launch, Well Barrier & Isolation, Technology, SIMULTRA

IMAGINE...redressing high spec plugs in the field

Posted by Peak Well Systems on 21-Dec-2015 10:00:00

YOU IMAGINED IT. WE CREATED IT.

Read More

Topics: Flow Control, Well Intervention, New Product Launch, Technology, SIMULTRA, MetaPlex

IMAGINE...being certain of retrieving your plug

Posted by Peak Well Systems on 11-Dec-2015 12:00:00

YOU IMAGINED IT. WE CREATED IT.

Read More

Topics: Flow Control, New Product Launch, Well Barrier & Isolation, Technology, SIMULTRA

Peak's in-well testing on SIMULTRA and PowerTool a success

Posted by Peak Well Systems on 10-Dec-2015 15:00:00

Peak Well Systems new SIMULTRA Retrievable Bridge Plug incorporating MetaPlex seal technology and its associated setting/retrieval tool, the PowerTool, were put through their paces by Peak’s experienced field specialists last week.

Read More

Topics: New Product Launch, Well Barrier & Isolation, Technology, Testing, SIMULTRA, MetaPlex, PowerTool

IMAGINE...superior reliability with 110% retraction

Posted by Peak Well Systems on 10-Dec-2015 11:56:08

Get set for the latest product in our portfolio - a V0-rated SIM plug with game-changing performance specifications. This incredible new tool was unveiled in November at ADIPEC 2015 in Abu Dhabi and the ICoTA Well Intervention Conference in Aberdeen.

Read More

Topics: Flow Control, New Product Launch, Technology, SIMULTRA

Improving the performance of wells through advanced downhole technology

Subscribe to our blog for insights into the latest industry technologies and innovations, and learn how we are helping our customers reduce well operating costs and improve well performance.

Subscribe to Email Updates

Recent Posts