Peak Well Systems Blog

Peak Customer commissions Peak to undertake gas testing of the 4-1/2” and 5-1/2” SIMULTRA Retrievable Bridge Plug

Posted by Peak Well Systems on 23-Aug-2016 15:00:00

Peak is pleased to announce that it has been commissioned by an international oil company (the “Customer”) to undertake gas testing of both the 4-1/2” and 5-1/2” SIMULTRA Retrievable Bridge Plug at a 10,000psi and 175degC specification. 

Read More

Topics: Testing, SIMULTRA, MetaPlex

Peak’s 5-1/2” SIMULTRA Retrievable Bridge Plug receives V0 certification

Posted by Peak Well Systems on 09-Jun-2016 13:01:21

Peak Well Systems has reached another important milestone in the development program for its SIMULTRA range of retrievable bridge plugs. The range of available plugs has now been extended into 5-1/2” applications with the successful ISO-14310 V0 gas testing of the 5-1/2” tool in 20lb API casing.

Read More

Topics: Testing, SIMULTRA, MetaPlex

Peak’s SIMULTRA Retrievable Bridge Plug receives V0 certification at 10kpsi

Posted by Peak Well Systems on 26-Apr-2016 12:00:00

Peak Well Systems has reached a major milestone in the development program for its SIMULTRA range of retrievable bridge plugs with the successful ISO-14310 V0 gas testing of the 4-1/2” tool in 15.1lb API pipe at an industry leading 10,000psi and 175degC specification.

Read More

Topics: Testing, SIMULTRA, MetaPlex

IMAGINE...redressing high spec plugs in the field

Posted by Peak Well Systems on 21-Dec-2015 10:00:00

YOU IMAGINED IT. WE CREATED IT.

Read More

Topics: Flow Control, Well Intervention, New Product Launch, Technology, SIMULTRA, MetaPlex

Peak further invests in Aberdeen Technology Centre to support manufacture of new SIMULTRA range

Posted by Peak Well Systems on 16-Dec-2015 14:10:35

Peak Well Systems is pleased to announce it has made a further investment in its Aberdeen Technology Centre in support of ongoing R&D and commercialisation of its newly launched SIMULTRA range – a new generation of flow control products suitable for gas wells and other extremely challenging applications.

Read More

Topics: Peak Corporate, SIMULTRA, Press Release, manufacturing, MetaPlex, Technology Centre, Aberdeen, Investment, SIM Plugs

Improving the performance of wells through advanced downhole technology

Subscribe to our blog for insights into the latest industry technologies and innovations, and learn how we are helping our customers reduce well operating costs and improve well performance.

Subscribe to Email Updates

Recent Posts