A National Oil Company with operations in offshore Africa experienced a Tubing Retrievable Surface Controlled Sub-Surface Safety Valve (TRSCSSSV) failure on its subsea well at 951m, with 7000bopd production locked in.
Peak 's key objective was to offer a cost effective solution which included setting a new type of valve in place of a full workover, in a challenging subsea environment.