Peak Well Systems Blog

Peak’s SIMULTRA Retrievable Bridge Plug receives V0 certification at 10kpsi

Posted by Peak Well Systems on 26-Apr-2016 12:00:00

Peak Well Systems has reached a major milestone in the development program for its SIMULTRA range of retrievable bridge plugs with the successful ISO-14310 V0 gas testing of the 4-1/2” tool in 15.1lb API pipe at an industry leading 10,000psi and 175degC specification.

Read More

Topics: Testing, SIMULTRA, MetaPlex

How to free wire at depth and retrieve to surface in high deviation wellbore

Posted by Peak Well Systems on 15-Apr-2016 12:25:16

Technology in Action: Precision cutting of wire at depth and retrieving to surface in high deviation wellbore

During drift run operations to determine the depth of a third party retrievable bridge plug downhole, the drift assembly was unable to retract through the 5 ½” x 4 ½” completion crossover rendering it stuck downhole at a depth of 2,349m at 65 degrees deviation.

A cutter was required to free the wire (0.125” OD GD31MO) exactly at depth allowing it to be retrieved back to surface.

Read More

Topics: Technical Case Studies, Aberdeen, eCutter, Well Servicing in High Angle Wells, Fishing Systems

SIM Plug set and retrieved in horizontal wells using tractor and stroker

Posted by Peak Well Systems on 21-Mar-2016 15:21:44

Technology in Action: Well barrier solutions in horizontal wells

Recent onshore testing sought to evaluate an e-line deployed well tractor, well stroker, and slickline configuration toolstring for mechanical well interventions in highly deviated or horizontal wells.

Read More

Topics: Technical Case Studies, Well Barrier & Isolation, SIM Plugs

Peak's solution for successful heavy duty fishing at depth in a high deviation well

Posted by Peak Well Systems on 28-Jan-2016 15:45:41

Technology in Action: High Deviation Heavy Duty Fishing in North Sea

A wireline service company in the North Sea used Peaks innovative tools to provide a solution for recovering a competitor’s bridge plug that had become stuck downhole. The 5 ½” bridge plug was set at 10,500ft in a highly deviated 77 degree well, giving additional concerns about the challenge of deploying intervention tools to such depth and deviation.

Peak's solution? A high deviation toolstring consisting of a Multi-Function Rope Socket, Power Jars, Linear Jars, and WellGlide Roller Centralisers.

Read More

Topics: Technical Case Studies, Premium Utility Toolstring, Toolstring, WellGlide, High Deviation, Heavy Duty Fishing, Peak Technology in Action

Peak appoints Neil Poxon as Global Business Development Director

Posted by Peak Well Systems on 11-Jan-2016 08:00:00

Peak Well Systems is pleased to announce the appointment of Neil Poxon as Global Business Development Director, effective immediately.

Read More

Topics: Peak Corporate, Press Release, Aberdeen, Executive team

Improving the performance of wells through advanced downhole technology

Subscribe to our blog for insights into the latest industry technologies and innovations, and learn how we are helping our customers reduce well operating costs and improve well performance.

Subscribe to Email Updates

Recent Posts