Peak Well Systems Blog

Retrieval of injection valve from tubing crossover at depth

Posted by Peak Well Systems on 05-Jul-2016 12:30:00

A Customer was retrieving a bridge plug and injection valve to surface when the injection valve separated from the plug and landed at the 5-1/2" by 4-1/2" tubing crossover at 10,400ft.

An efficient method to fish the injection valve without causing damage to the tubing crossover was required so the injection value could be pulled and a new injection valve set.

Read More

Topics: Technical Case Studies, Wellbore Clean-up and Debris Removal, HTHS Magnet

Improve well performance on a tight budget with Peak Rentals

Posted by Peak Well Systems on 23-Jun-2016 16:00:00

Even in a downturn, the oil industry doesn’t stand still. That’s why Peak Well Systems offers the best solution of superior downhole technology for Flow Control and Well Intervention available on short or long rental terms.

Read More

Topics: Flow Control, Well Intervention, rentals

Retrieval of equipment lost in the well and fast-track production restart

Posted by Peak Well Systems on 17-Jun-2016 16:13:27

Technology in Action: Retrieval of equipment lost in the well and fast-track production restart

Peak Well Systems’ range of market leading Fishing Systems has a highly successful track record of recovering items lost down the wellbore and expediting a return to production for customers.

Read More

Topics: Technical Case Studies, Well Intervention, Power Jar, Fishing Systems, HD-FRC Pulling Tool, HD Fishing, Non-Releasable Overshot

Peak’s 5-1/2” SIMULTRA Retrievable Bridge Plug receives V0 certification

Posted by Peak Well Systems on 09-Jun-2016 13:01:21

Peak Well Systems has reached another important milestone in the development program for its SIMULTRA range of retrievable bridge plugs. The range of available plugs has now been extended into 5-1/2” applications with the successful ISO-14310 V0 gas testing of the 5-1/2” tool in 20lb API casing.

Read More

Topics: Testing, SIMULTRA, MetaPlex

How to successfully remove hard scale from production tubing when acidizing attempts are not fully successful

Posted by Peak Well Systems on 03-May-2016 12:00:00

Technology in Action: Successful trial test to remove hard scale from production tubing using mechnical means

Read More

Topics: Technical Case Studies, Well Intervention, Wellbore Clean-up and Debris Removal, Torque Action Debris Breaker, TADB

Improving the performance of wells through advanced downhole technology

Subscribe to our blog for insights into the latest industry technologies and innovations, and learn how we are helping our customers reduce well operating costs and improve well performance.

Subscribe to Email Updates

Recent Posts